Fuel Cost Charge Report Non-generating electric utilities Purchasing from one supplier with line losses justified
Name of utility:
Bartholomew County REMC
Consumption month(s):
Current
Billing month(s):
Supplier:
Hoosier Energy REC, Inc.
(1) Supplier's fuel cost charge:
$0.000000/kWh
(2) Deduct base cost of fuel:
(3) Difference [negative if (2) > (1)]:
(4) One minus decimal fraction of line losses for last calendar year:
$0.0000/kWh
(5) Final fuel cost charge = (3) divided by (4):
Appendix A Appendix B Appendix FC
Tariffs:
Schedule A
Schedule B
Fire Signal Rider to Schedule B
Schedule IPS
Schedule OSL
Schedule PSL
Schedule LP
Schedule OP
EDR Rate No. 4
EDR Rate 5-CP
EDR Rate 5-NCP
Green Power